Vietnam appeal court upholds dismissal of insurers’ US$577.8K hydropower recovery claim

Bao Viet's appeal was dismissed for lack of new evidence, while fellow insurers GIC and DBV withdrew their appeals.
Gavel and balance scales on a desk with law books in the background.
November 25, 2026

 • 

2 min read
(Re)in AsiaSIRC 2026 Hub(Re)in AsiaSIRC 2026HubExplore the hub →

(Re)in Summary

  • Vietnamese court upholds dismissal of three insurers’ VND14.9bn (US$577,834) hydropower recovery claim.
  • Bao Viet’s appeal was rejected, while GIC and DBV withdrew theirs.
  • A court-commissioned assessment found that the tunnel’s designs met structural safety requirements.

A Vietnamese appellate court upheld the dismissal of a VND14.9bn (US$577,834) insurance recovery claim brought by three insurers against engineering companies over the 2016 collapse of a diversion tunnel at the Song Bung 2 Hydropower Project.

Power Engineering Consulting Joint Stock Company 2 (PECC2), one of the defendants, in a stock exchange filing said that the Appellate Court of the Supreme People’s Court in Ho Chi Minh City rejected an appeal by Bao Viet Insurance Corporation, while terminating proceedings relating to appeals withdrawn by Global Insurance Corporation (GIC) and Vietnam National Aviation Insurance Corporation, now known as DBV Insurance Group.

The three insurers sought to hold PECC2, Power Engineering Consulting Joint Stock Company 3 (PECC3) and China’s Kunming Engineering Corporation Limited (KHIDI) jointly and severally liable for the reimbursement of insurance payments.

The ruling, which took legal effect on 25 August 2026, upheld a September 2025 judgment that rejected the insurers’ claims in full.

According to the court judgment disclosed by PECC3 earlier this month, the GIC-led consortium had provided construction and installation all-risks and third-party liability cover for the 100MW hydropower project since 2011.

The tunnel collapsed in September 2016 following heavy rainfall, damaging project infrastructure and downstream properties.

GIC accounted for 70% of the recovery sought, equivalent to VND10.4bn, while Bao Viet and DBV accounted for 20% and 10%, respectively.

The dispute centred on conflicting technical assessments. A 2017 report by Vietnam’s Ministry of Industry and Trade identified design and construction deficiencies, but a court-commissioned assessment in 2024 concluded that the tunnel’s designs met structural safety requirements.

The appellate court accepted the latter assessment as evidence and found that Bao Viet had failed to present new evidence to support its appeal.